Server Move, Data Centre 1 – Data Centre

RedBull -Server Move, Data Centre 1 – Data Centre - Case Study

Introduction

Due to infrastructure expansion, power and cooling requirements Technimove were approached by Red Bull Technology the Formula 1 arm of the global company Red Bull to provide resources and project management for an internal relocation project involving the relocation of 40 track side servers between two internal data centres.

Due to time constraints of the F1 Season Summer Break, the current Formula 1 Constructors and Drivers World Champions required a professional and experienced partner to complete the move ensuring that downtime was minimised and the relocation of the business critical equipment was carried out safely.

Technimove’s Solution

Technimove carried out a free site survey and project meeting to understand Red Bulls full requirement and the key drivers behind the project.  The Red Bull technical team were highly capable, and due to the level of the technical aspects of the project it was agreed that to utilize Technimove’s ‘de-rack to re-rack solution would enable the Red Bull team to focus their attention by removing the headache of the physical migration.

The Red Bull team were scheduled to work late into the night on a Friday, with Technimove being given a small time window in which to complete the project with a 09:00 start time on Saturday.  Technimove’s team of engineers arrived onsite at 08:00
to be fully prepared for the 09:00 start time.  The team began by preparing the collection environment before de-commissioning the pre-labeled server, storage and comms equipment.

All equipment was individually wrapped in anti-static bubble wrap before being placed in Technimove’s purpose built foam lined server flight cases.  The equipment was then transported from Building 1 to Building 3 where the

second Data Center resides. Technimove’s engineers then re-racked equipment in-line with the rack plans provided and connected power cables to devices which were not pre-programmed to boot with the connection of power.  Technimove engineers also de-racked 10 legacy items which were to be disposed of in line with the WEEE Directive.

Even with the short down time window of the F1 Summer Break, Red Bull were thoroughly prepared technically for the project, and with clear communication and planning between Technimove and Red Bull the project was success being completed on time and without issue.

Technimove gave Red Bulls project wings!

Technimove are a server relocation company who also specialize in Data Centre Auditing, IT Recycling, Data Centre Migration and It Asset Management.

Download This Case Study

Other related Case Studies

We Solve Real Problems

what can we do for you?

Discovery and Analysis Icon

Discovery and Analysis

Analysing current issues and future needs offering tailored, flexible and scalable solutions.

Programme and Project Management Icon

Programme and Project Management

Delivering responsibility from design through to successful execution.

Technical Delivery Icon

Technical Delivery

Supporting clients with business service assurance, operational readiness and service availability.

Need Help On Where To Begin?

Contact Technimove Digital Transformation

Start your consultation today, call UK: 020 8686 8800 US: 1 800 675 0538

Technimove Logo

US Head Office

London City Office

EU Office

Ireland Office

Technimove GmbH

European Head Office

We value your privacy

We use cookies to enhance your browsing experience. We will assume you are ok with this, you can opt out if you wish.

Find out more here: Learn More