Background

A global technology solutions provider was preparing to expand its on‑site infrastructure at its Birmingham office and required a reliable installation partner to ensure the environment was built correctly from the outset. The organisation was introducing new equipment to support its wider IT strategy and needed a fully prepared rack that would provide stable power, structured layout and a clear foundation for future hardware.

Although the space was not a traditional data hall, the installation still needed to meet the same standards expected in a technical environment. The client could not afford misalignment, incorrect commissioning or any disruption to their working day. With internal teams focused on ongoing operations, they sought a specialist who could take full ownership of the installation, manage all documentation requirements and deliver a ready to use rack with minimal involvement from their side.

Technimove was engaged to ensure the installation was completed smoothly, accurately and within a tight in hours work window. The goal was simple: provide the client with a high quality, correctly commissioned rack environment that would support their business from day one without the need for rework or additional coordination.

Client and Environment

The work took place within a live corporate office environment where maintaining order and avoiding disruption were essential. The client required a new rack installation to support their upcoming IT requirements and ensure their infrastructure was ready ahead of future workload deployment.

The project was driven by the need to prepare the site for new systems and avoid delays to wider operational plans. Although there was no fixed deadline, the installation had to be completed within a weekday morning window. From the outset, the client was concerned about accuracy, build quality and ensuring the installation did not impact other areas of the business.

Technical Complexity

The project involved installing a 42U APC rack, a 24 way PDU and multiple APC UPS units. Each component had to be aligned and commissioned correctly in line with the documentation provided.

The client benefited from a clean and correctly assembled rack that supported future expansion. The UPS installation ensured reliable power protection and reduced the risk of issues during early use. The team also followed predefined cabling ratios and patching schedules which prevented layout inconsistencies and future troubleshooting challenges.

Constraints

The project had to be delivered within in hours access and required all equipment to be staged onsite ahead of the team arriving. Documentation including rack plans, patching schedules and equipment lists had to be received at least three days before installation. Having these elements in place allowed Technimove to remove delays and manage the project with precision.

Our Solution

Scope of Work

Technimove delivered a full installation service that provided the client with a single point of responsibility. The scope included project management, rack verification, installation of APC infrastructure, commissioning of UPS units, in rack patching and power up testing alongside the client.

This approach removed the need for the client to coordinate multiple parties and ensured the installation remained structured and predictable from start to finish.

Equipment and Infrastructure

The installation consisted of a single 42U APC rack and associated power components. Standard handling methods were used to install the UPS units safely and ensure equipment stability.

The client received a fully assembled and compliant rack build that met their technical requirements and provided a stable foundation for future hardware.

Execution

The project was delivered in a single phase during standard working hours. Engineers followed a planned sequence which included verification of documentation before arrival, correct rack depth setup, safe installation of UPS units, precise patching within the rack and a joint power up and test with the onsite representative.

This structured approach reduced risk and removed uncertainty during the build. Early verification of plans and schedules helped prevent delays or onsite changes.

Outcome

Immediate Results

The client received a fully operational rack that was installed and commissioned to specification. Power and UPS configuration was completed successfully and the environment was ready for immediate use. The project was delivered within the expected timeframe and without any disruption to the business.

The client gained a stable and reliable platform for future growth and did not require any internal rework or corrective activity.

Why Global Technology Solutions Providers Choose Technimove

Global technology solutions providers choose Technimove because we make complex infrastructure changes straightforward. We handle migrations, decommissioning and IT asset disposal with secure processes, certified data wiping and clear chain‑of‑custody. This gives organisations confidence that their equipment and data are managed safely and responsibly.

They also value the way we work. Our teams plan well, communicate clearly and take ownership from start to finish, reducing pressure on internal teams. Whether moving hardware or retiring legacy systems, we help global providers keep operations running smoothly while meeting compliance and sustainability goals.

About Technimove

Technimove is a specialist data centre transformation and professional services provider, supporting organisations through critical infrastructure change. From discovery and assessment through to delivery and optimisation, we help customers reduce risk, improve performance, and make confident technology decisions that support long‑term business goals.

Planning a Data Centre Migration? Speak to Technimove and plan your migration with confidence.

START HERE

We’re the experts, ask us anything, we’ll find the answer.
CONTACT US